Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Author
Suwanto, Bryan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas akhir No.21011681/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix : p. 90 - 148
Bibliography : p. 88 - 148
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 148 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03348/09
(T) 658.404 Suw F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi penerapan manajemen rantai pasok pengadaan material proyek konstruksi
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Studi kelayakan untuk pembangunan ruko di Perumahan Citra Raya Surabaya
Analisis faktor-faktor yang mempengaruhi perilaku konsumen dalam pembelian rumah menengah di Surabaya Barat
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Studi kelayakan pada hotel berbintang tiga di Surabaya dilihat dari aspek pasar dan aspek keuangan
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya