Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Author
Suwanto, Bryan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas akhir No.21011681/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix : p. 90 - 148
Bibliography : p. 88 - 148
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 148 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03348/09
(T) 658.404 Suw F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Studi literatur tentang penerapan learning organization pada perusahaan kontraktor
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Kepuasan mandor terhadap pola komunikasi pada proyek perumahan
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Studi mengenai penerapan manajemen risiko oleh perusahaan kontraktor di Surabaya
Evaluasi studi kelayakan aspek keuangan proyek pusat perbelanjaan megamall Manado