Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Author
Vernatha, Jemmy
Additional Author(s)
Eldad, Shamgar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012173/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
SCHEDULING
PROJECT MANAGEMENT
Notes
Appendix: p. 49-53
. Bibliography: p. 47-48 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01775/18
(T) SIP 2173
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Analisis ekonomis sebagai dasar pengambilan keputusan dalam penggantian excavator
Construction scheduling
Kajian awal mengenai peformance intensity (momentum management) untuk mengukur kinerja waktu proyek konstruksi
Evaluasi sistem manajemen k3 terhadap metode pemancangan jack-in pile
Perancangan sistem informasi manajemen sumber daya manusia perusahaan kontraktor (studi kasus di P.T. "X")
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)
Penyebab,dampak, dan antisipasi change order pada proyek gedung tinggi di Surabaya menurut owner dan kontraktor