Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Author
Cahyadi, Antony Kristanto
Additional Author(s)
Biantoro, Rick
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012181/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-62
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 62 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02793/17
(T) SIP 2181
Library - 8th Floor
Available
Similar Collection
by author or subject
Penerapan dan pemberian milestone pada metode earned schedule untuk pengendalian penjadwalan pada beberapa proyek
Studi penerapan keselamatan dan kesehatan kerja (K-3) dalam penggunaan tower crane pada proyek konstruksi
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Analisa faktor-faktor yang mempengaruhi perencanaan durasi aktifitas dalam proyek koonstruksi
Faktor sukses kunci bagi kontraktor perumahan pada real estate
Pre-contract practice
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi
Penelitian dampak dari sumber daya dan strategi pada performa perusahaan konstruksi