Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa quantity take-off dengan menggunakan autodesk revit
Author
Laorent, Danny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No.01000211/MTS/2016
Subject(s)
AUTODESK REVIT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 57-58.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02617/16
(T2) MTS 0211
-
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Pengaruh penambahan silicon carbide terhadap karakteristik mortar
Faktor-faktor yang mempengaruhi produktivitas pekerja dalam bidang konstruksi di Surabaya
CPM in construction management
Pengaruh kinerja keuangan dan faktor makro ekonomi terhadap return saham perusahaan properti di bursa efek Jakarta
Analisa dan evaluasi sisa material konstruksi pada pembangunan ruko di Surabaya
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi