Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Author
Desyllia
Additional Author(s)
Chendra, Fibbie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011935/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 71 - 128
. Bibliography: p. 68 - 70.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01376/14
(T) 658.924 Des M
-
Unavailable : Removed
Similar Collection
by author or subject
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Identifikasi nvaau dan studi vsm pada proyek X di Surabaya
Analisa penggembangan produk properti berdasarkan aspek non finansial dan aspek finansial
Analisis biaya dan kemungkinan investasi rumah tipe di Citra Raya dan Wisata Bukit Mas
Analisa pengambilan keputusan pada perusahaan realestat menghadapi masa krisis
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)