Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Author
Desyllia
Additional Author(s)
Chendra, Fibbie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011935/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 71 - 128
. Bibliography: p. 68 - 70.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01376/14
(T) 658.924 Des M
-
Unavailable : Removed
Similar Collection
by author or subject
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Produktivitas tower crane pada apartemen
Construction planning and scheduling
Perancangan sistem informasi manajemen sumber daya manusia perusahaan kontraktor (studi kasus di P.T. "X")
Analisa pengambilan keputusan dalam pemilihan metode bekisting pada bangunan silo di Gresik
Analisa dan evaluasi sisa material konstruksi pada pembangunan ruko di Surabaya
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi
A guide to the project management body of knowledge