Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Author
Prajogo, Erwin Setyo
Additional Author(s)
Tistogondo, Yunaedy
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 04010825/IND/2004
Subject(s)
MOTION STUDY
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 123 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03644/04
(T) 658.54 Pra E
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan keseimbangan lintasan di PT. Eben Haezer Surakarta
Penentuan reward di PT Fuboru Indonesia
Rancangan perbaikan standar metode kerja berdasarkan micromotion study untuk mengurangi motion waste
LKP : analisa sistem produksi sprocket di PT Morita Tjokro Gearindo Jakarta
Perencanaan kebutuhan material sabun di PT Megasurya Mas
Analisa kecukupan jumlah transporter dan rancangan jadwal shift kerja operator di PT Philips Indonesia
Pengukuran kinerja hotel-hotel berbintang di Surabaya dengan menggunakan balanced scorecard sebagai alat pengukur kinerja
Teknik penghitungan volume kerja