Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Author
Prajogo, Erwin Setyo
Additional Author(s)
Tistogondo, Yunaedy
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 04010825/IND/2004
Subject(s)
MOTION STUDY
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 123 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03644/04
(T) 658.54 Pra E
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan fasilitas dan sistem kerja dengan pendekatan ergonomi pada bagian pengebalan di departemen SKT Rungkut-2 PT "X"
Implementasi KPI dan perancangan sistem e-KPI pada PT. XYZ
LKP : pengukuran waktu kerja dan peta peta kerja di CV Phoenix Mas Lombok Barat
Analisa regresi untuk penetapan waktu standard pembuatan tangki (study kasus di PT Meco)
Analisis pengaruh supply chain management terhadap keunggulan bersaing dan kinerja perusahaan
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X
Perancangan produksi dan pengendalian persediaan di UD. Kompas
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X