Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi KPI dan perancangan sistem e-KPI pada PT. XYZ
Author
Darmadji, Kevin Chevalia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021992/IND/2016
Subject(s)
BALANCED SCORECARD
WORK MEASUREMENT
KEY PERFORMANCE INDICATORS (KPI)
Notes
Appendix: p. 47-48
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02549/16
(T) IND 1992
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
LKP : PT Ganda Wangsa Utama
Upaya pemenuhan target produksi di PT Sidhakarya Anggawa Adipala
Pemilihan alternatif sistem penjadualan di PT Solihin Jaya
Perancangan enterprise architecture di SMA Katolik Sato Augustinus dengan metode Enterprise Architecture Planning (EAP)
Perencanaan dan penjadualan produksi di PT.Duta Citra Audio Raya
Pemodelan enterprise architecture pada perusahaan palet PT. X menggunakan enterprise architecture planning
Perencanaan kebutuhan material sabun di PT Megasurya Mas