Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi KPI dan perancangan sistem e-KPI pada PT. XYZ
Author
Darmadji, Kevin Chevalia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021992/IND/2016
Subject(s)
BALANCED SCORECARD
WORK MEASUREMENT
KEY PERFORMANCE INDICATORS (KPI)
Notes
Appendix: p. 47-48
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02549/16
(T) IND 1992
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Arta Glory Buana Sidoarjo
Peningkatan kinerja melalui implementasi rekomendasi peda pt. xyz dengan metode balanced scorecard.
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Perancangan pengukuran standar kinerja Puskesmas pemerintah kota Surabaya dengan mbnqa
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor industri restoran
Perancangan keseimbangan lintasan produksi pada perusahaan koper
Perencanaan perbaikan proses administrasi dan analisis kebutuhan operator proses produksi PG 1160 do PT E-T-A Indonesia