Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimalisasi kapasitas untuk memenuhi perencanaan produksi di PT X
Author
Taurusia, Lina
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041286/IND/2008
Subject(s)
MOTION STUDY
PRODUCTION PLANNING
TIME STUDY
Notes
Appendix: p. 83 - 242
Bibliography: p. 82
Abstract
-
Physical Dimension
Number of Page(s)
iv, 242 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03073/08
(T) - 658.5038 Tau O
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem pengukuran kinerja dengan metode integrated performance measurement systems di PT. Cahaya Angkasa Abadi
Peningkatan kapasitas produksi di PT Wangta Agung I
Pengalokasian operator pada lantai produksi PT X
Perencanaan tenaga kerja yang efektif pada perusahaan kecap cap jeruk pecel tulen
Perancangan sistem perencanaan produksi dan pengendalian persediaan pada frollino pastry di Surabaya
Perancangan sistem PPIC air mineral di PT. X
Penjadwalan produksi untuk meminimumkan setup time dan memaksimumkan aliran uang dengan metode genetic algorithm studi kasus pada CV. WP
Pengurangan lead time produksi mcset di PT. Schneider Indonesia