Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran kinerja di PT. Lotus Indah Textile Industries dengan menggunakan metode integrated performance measurement systems
Author
Suryajaya, William
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01021014/IND/2005
Subject(s)
WORK MEASUREMENT
TIME STUDY
PRODUCTION CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01642/06
(T) - 658.54 Sur P
-
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan kinerja proses produksi cetakan tiang pancang di CV Delta Mas
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Usulan upaya pengurangan downtime mesin potong single deck di PT. 'X'
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
LKP : pengukuran waktu kerja dan peta peta kerja di CV Phoenix Mas Lombok Barat
LKP : PT Arika Kharisma Agung
Dampak peranan konsultan, komitmen manajemen, dan user controller terhadap kinerja perusahaan melalui implementasi TQM
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra