Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Author
Yoseano B, Raymond
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041007/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00480/06
(T) - 658.542 Yos P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : penjadwalan kerja di PT Surya Tedjakusuma
Analisa standarisasi kerja operator bush forming dan pin cutting menggunakan metode tabel standar kombinasi kerja di PT. XYZ
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
Methods, standards, and work design
Analisa manajemen waktu terhadap peningkatan produktivitas kerja karyawan PT. Bank "XYZ" di Kotamadya Surabaya
Analisa perbandingan produktivitas proses produksi antara mesin hidrolik ohtake dengan mesin hidrolik manual di PT Fuboru Indonesia
Standarisasi aliran proses dan informasi pada departemen transport di PT. A
LKP : PT Arta Glory Buana Sidoarjo