Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Author
Yoseano B, Raymond
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041007/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00480/06
(T) - 658.542 Yos P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Glogarindo Surabaya
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Motion and time study
Upaya peningkatan kapasitas produksi stasiun giling dan efisiensi pekerja stasiun press bale di mitra produksi sigaret PT X
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Motion and time study
Penentuan keputusan perawatan forklift pada area finish good PT Charoen Pokphand Feedmill Balaraja