Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Author
Yoseano B, Raymond
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041007/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00480/06
(T) - 658.542 Yos P
-
Unavailable : Removed
Similar Collection
by author or subject
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Pengukuran kinerja di PT. Lotus Indah Textile Industries dengan menggunakan metode integrated performance measurement systems
Analisa tata letak ruang Gedung K lantai dasar Universitas Kristen Petra
LKP : proses produksi di PT Bumi Widjaja Indah Kencana
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.