Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Author
Yoseano B, Raymond
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041007/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00480/06
(T) - 658.542 Yos P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : penjadwalan kerja di PT Surya Tedjakusuma
Pemilihan alternatif sistem penjadualan di PT Solihin Jaya
Evaluasi waste dengan menggunakan konsep lean manufacturing di CV X
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Pengalokasian operator pada lantai produksi PT X
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Value stream mapping proses operasional uniform di PT. X
Perancangan standar proses dan waktu proses pembuatan packing pada suplier PT X.