Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan standar proses dan waktu proses pembuatan packing pada suplier PT X.
Author
Valiant, Bernardus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 02022161/IND/2018
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 52-57
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 57 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03321/18
(T) IND 02-2161
Library - 8th Floor
Available
Similar Collection
by author or subject
Sukses anda terletak pada putaran waktu
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Upaya peningkatan kenyamanan kerja melalui pendekatan ergonomis perusahaan 'X' Surabaya
Perencanaan penjadualan pada departemen produksi di PT Integra Indocabinet
Perancangan produksi dan pengendalian persediaan di UD. Kompas
Perancangan fasilitas kerja pada departemen pengecatan dengan menggunakan pendekatan ergonomi guna meningkatkan produktivitas kerja di Perusahaan Eternit Hero Malang
LKP : PT Classic Prima Carpets Industries Surabaya
Peningkatan kinerja melalui implementasi rekomendasi peda pt. xyz dengan metode balanced scorecard.