Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya pencapaian target output mesin injeksi 7 dan penempatan material finishing pada storage area di PT. X
Author
Kelly
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022165/IND/2018
Subject(s)
WORK MEASUREMENT
WORK SAMPLING
Notes
Appendix: p. 116-174
. Bibliography: p. 114-115.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 172 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03330/18
(T) IND 01-2165
Library - 8th Floor
Available
Similar Collection
by author or subject
Perencanaan produksi di PT, "X"
Perancangan alat bantu dan usulan perbaikan sistem kerja departemen extruder di PT. Kertarajasa Raya Sidoarjo
Pengukuran kinerja di hotel "X" dengan metode performance prism
Peran internal organisasi dan suasana inovasi untuk peningkatan kinerja UKM
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Pengoptimalan jumlah man power pada departement delivery area dengan metode work force analysis di PT. ZXC
Pengukuran kinerja perusahaan dengan menggunakan kriteria malcolm baldrige national quality award dan usulan perbaikan di pt. bumi menara internusa
LKP : proses produksi di PT Bumi Widjaja Indah Kencana