Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan dan pengukuran kinerja perusahaan kaca dengan metode performance prism
Author
Santoso, Budi
Additional Author(s)
Suryadinata, Elvira
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010923/IND/2005
Subject(s)
WORK MEASUREMENT
TOTAL QUALITY MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 252 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01650/05
(T) - 658.542 San P
-
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kapasitas produksi dengan pendekatan simulasi di pt. x
LKP : bagian proyek pembangunan Jalan Gempol-Pasuruan (paket AK-3) Bangil
Perencanaan dan pembuatan daya nyata (KWH meter), untuk tegangan 220/380 volt, arus 6 ampere, 3 phasa untuk industri dengan menggunakan MCS-51
LKP: Rumah tinggal Jalan Tidar 59-61 Surabaya
Total quality in research and development
Pengukuran kinerja perusahaan dengan menggunakan kriteria malcolm baldrige national quality award dan usulan perbaikan di pt. bumi menara internusa
Perencanaan penjadualan pada PT Aneka Kayu Indah Nusantara
LKP : PT Dharma Satya Nusantara Jl. Kapt. Dharmo Sugondo Gresik