Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
Author
Subiakto, Bonifasius Taufik
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040818/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03713/04
(T) 658.5 Sub P
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Penjadualan produksi ubin keramik single firing di PT Asia Victory Industri Ltd.
Upaya penurunan tingkat keterlambatan pemenuhan permintaan di PT. 'X'
Manufacturing planning and control for supply chain management
Perancangan sistem suplai tanpa penambahan tempat di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Analisa produktivitas pekerja dengan metode work sampling: Studi kasus pada proyek X
Product strategy and management
The lean design guidebook