Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
Author
Subiakto, Bonifasius Taufik
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040818/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03713/04
(T) 658.5 Sub P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengurangan setup dalam usaha pengoptimalan investasi
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Perancangan sistem perencanaan produksi di Agrindo Engineering Unit (AEU) PT Agrindo
Perancangan value stream mapping dalam mengidentifikasi waste dan upaya pengurangan waste pada PT X
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Penjadwalan produksi menggunakan metode tabu search dengan solusi awal prosedur shifting bottleneck di PT. Agrindo
Perbandingan metode lot for lot policy after stage 1 dan forecast beyond the planning horizon untuk perencanaan kebutuhan material di PT Golden Rubberindo
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.