Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
Author
Subiakto, Bonifasius Taufik
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040818/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03713/04
(T) 658.5 Sub P
-
Unavailable : Removed
Similar Collection
by author or subject
Motion and time study for lean manufacturing
Analisa dan perencanaan perbaikan Produktivitas di PT. Jatim Taman Steel
Upaya pengelolaan manajemen waktu kunjungan untuk menunjang pertumbuhan volume penjualan produk pakaian tidur di lima kantong pasar di Surabaya
Perencanaan produksi agregat dengan model liniear programming dan perencanaan kebutuhan bahan baku di PT. Irama Tembang Elok
Analisa perbandingan metode local search pada algoritma ant colony untuk menyelesaikan permasalahan penjadwalan flowshop
Pengalokasian operator pada lantai produksi PT X
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
Analisis produktivitas staf administrasi bagian bahan baku PT Bumi Rotan Jaya