Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Author
Hariyanto, Tjin Hendri Kristian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041369/IND/2009
Subject(s)
PRODUCTION PLANNING
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 76
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02731/09
(T) 658.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis pemilihan pola produksi ekonomis untuk memenuhi rencana penjualan pada pabrik biskuit "MW" di Ujung Pandang
The User's journey
Perencanaan penggunaan base paper pada unit coating dan finishing machine NCR dengan menggunakan program delphi 7.0 di CV Dirgahayu
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik
Evaluasi pasca implementasi sap pada departemen PPIC PT. X
Peningkatan kapasitas produksi pada UD. X
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Peningkatan output produksi dan perancangan sistem di assy line tampio PT Astra Otoparts divisi adiwira plastik