Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi pasca implementasi sap pada departemen PPIC PT. X
Author
Sugianto, Jessica
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021713/IND/2013
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
Notes
Appendix: p. 33 - 55
. Bibliography: p. 22.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 55 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00681/14
(T) 658.5 Sug E
Library - 8th Floor
Available
Similar Collection
by author or subject
Penyusunan Hazard Analysis Critical Control Point (HACCP) produk sosis di PT Aromaduta Rasaprima
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
Upaya pencapaian target kapasitas produksi di line assembling western divisi gas PT Nayati Indonesia
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Peningkatan kinerja melalui implementasi rekomendasi peda pt. xyz dengan metode balanced scorecard.
Aplikasi program penjadualan dan fungsi kontrol bagian PPC di PT Lestari Karya Makmur
Analisa perbandingan kinerja laporan pengadaan material sebelum dan sesudah ERP SAP R/3 diimplementasikan di Domusindo Perdana
Operations management