Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbandingan kinerja laporan pengadaan material sebelum dan sesudah ERP SAP R/3 diimplementasikan di Domusindo Perdana
Author
Wijaya, Ronald
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011067/IND/2006
Subject(s)
INVENTORY CONTROL
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 151 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01649/06
(T) - 658.787 Wij A
-
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi penilaian 5S di area penyimpanan proyek konstruksi
LKP : PT Djajanti Universal Gresik
Peningkatan kontrol kualitas untuk mengurangi waste packaging di PT. ALP
Perancangan ISO 9001:2008 di PT Sentosa Alloy Industri, Sidoarjo
Peningkatan efisiensi kinerja procurement departement wismilak group
Analisa Penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa abadi sidoarjo
Perancangan quality plan di PT FSCM Manufacturing Indonesia Plant 4
Product design and development