Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Author
Teerta, Fangliana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040822/IND/2004
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
WORK MEASUREMENT-ANALYSIS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02532/04
(T) 658.542 Tee P
-
Unavailable : Removed
Similar Collection
by author or subject
Operations management
Penyusunan prosedur departemen produksi dan departemen QSHE di PT Charoen Pokphand Indoneisa Balaraja Feed Processing
Operations management
Perancangan sistem PPIC di PT. Mustikarama Citraperdana
Perencanaan produksi dan pengendalian inventory di Jaya Metal Coating
Perencanaan tenaga kerja yang efektif pada perusahaan kecap cap jeruk pecel tulen
Perancangan sistem perencanaan produksi di PT. Tanjung Nilam Printing
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel