Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Author
Teerta, Fangliana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040822/IND/2004
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
WORK MEASUREMENT-ANALYSIS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02532/04
(T) 658.542 Tee P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan jadwal maintenance dalam rangka aplikasi total productive maintenance (TPM) di PT Agrindo
Manajemen produksi
LKP : PT Ace Metal Indonesia
Made-to-order lean
Peranan otomatisasi dalam mengembangkan produk untuk meningkatkan produktivitas timbangan dacin pada Perusahaan "SSS" di Surakarta
Pengidentifikasian waste melalui value stream mapping dan upaya pengurangan waste pada Departemen PK PT X
Perancangan tata letak fasilitas produksi dengan pendekatan simulasi di CV. XYZ
Implementasi theory of constraints (TOC) guna mengoptimalkan profit di PT Teja Sekawan Cocoa Industri Surabaya