Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Author
Setiawan, Ronny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021445/IND/2010
Subject(s)
MANUFACTURING PROCESS
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 36 - 50
Bibliography : p. 35
Abstract
-
Physical Dimension
Number of Page(s)
xii, 50 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03819/10
(T) 658.5 Set A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh kualitas produk mie instant terhadap loyalitas konsumen melalui kepuasan konsumen mie instant di Surabaya
Process improvement using mtm-uas analysis at switch assembly line in schneider electric Indonesia Ltd.
Upaya penurunan downtime line assembly dengan mengevaluasi sistem total productive maintenance pada PT. XYZ
LKP : PT Sumber Makmur Perkasa Surabaya
Penurunan reject internal block batch produk cover boots dari kontaminasi debu di PT. XYZ
Speed to market
Identifikasi faktor-faktor motivasi yang mempengaruhi produktivitas kerja di PT Sari Warna Asli II Boyolali
Perancangan value stream mapping dalam mengidentifikasi waste dan upaya pengurangan waste pada PT X