Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya penurunan downtime line assembly dengan mengevaluasi sistem total productive maintenance pada PT. XYZ
Author
Frenatta, Jason Dio
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022137/IND/2018
Subject(s)
INDUSTRIAL PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 79-84
. Bibliography: p. 78.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03338/18
(T) IND 01-2137
Library - 8th Floor
Available
Similar Collection
by author or subject
Penjadwalan produksi dan pengendalian persediaan dengan tujuan optimalisasi biaya produksi pada divisi paku PT Surabaya Wire (suatu pendekatan program dinamis)
LKP : CV United Mesindo
Analisa penyebab lonjakan manhours ratio pada proses fabrikasi piping dan blasting painting di PT. Gunanusa Utama Fabricators
Elements of production planning and control
LKP : peramalan permintaan produk spring bed PT Indofibre Mattress
Pengukuran, evaluasi dan perencanaan peningkatan produktivitas pada PT. "X"
Manajemen produksi dan operasi
Manajemen produksi