Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kinerja melalui implementasi rekomendasi peda pt. xyz dengan metode balanced scorecard.
Author
Gozali, Rudy
Additional Author(s)
Sienny Kusuma
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0768/IND/2004
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xx, 271 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00514/04
(T) 658.5 Goz P
-
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan penanganan pemindahan proses packaging paku
Analisa biaya dan pengukuran kerja pada produk amplop dan box file di PT. X
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 angkatan 2010 dan 2012
Perencanaan penggunaan base paper pada unit coating dan finishing machine NCR dengan menggunakan program delphi 7.0 di CV Dirgahayu
Perancangan keseimbangan lintasan untuk meningkatkan kapasitas produksi pada perusahaan meja setrika
Analisa keseimbangan lintasan dengan mempertimbangkan studi gerakan pada lini perakitan 2 CV. Sinar Baja Electric
Cellular manufacturing one-piece flow for workteams
LKP : PT Arta Glory Buana Sidoarjo