Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan perbaikan fasilitas kerja pemotongan kabel divisi cable casing di PT. Insera Sena
Author
Setiawan, Anthony T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021614/IND/2012
Subject(s)
TIME STUDY
FACILITY MANAGEMENT
FACTORY MANAGEMENT
Notes
Appendix : p. 27 - 33
Bibliography : p. 26
Abstract
-
Physical Dimension
Number of Page(s)
xii, 33 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04568/12
(T) 658.2 Set U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
LKP : PT Arika Kharisma Agung
Facility management
Facilities design
Manajemen energi (Pilot proyek di departemen produksi PT. XXX)
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Upaya peningkatan kapasitas produksi stasiun giling dan efisiensi pekerja stasiun press bale di mitra produksi sigaret PT X