Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Author
Wijaya, Fenny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040830/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xx, 307 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/04
(T) 658.54 Wij P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis pengaruh persepsi sistem pengupahan dan disiplin kerja terhadap peningkatan kinerja karyawan PT. Tunjung Tirta Kencana
Fungsi public releations pakuwon permai dalam menyelenggarakan event untuk membina hubungan dengan konsumen
Respons masyarakat Surabaya mengenai iklan televisi "lux play with beauty"
Analisis gaya kepemimpinan transformasional dan transaksional, budaya organisasi, dan kinerja guru TK PPPK Petra
Penentuan reward di PT Fuboru Indonesia
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor industri restoran
Value stream mapping proses operasional uniform di PT. X
Optimalisasi utilitas mesin dan operator di PT. Aditama Raya Farmindo melalui pendekatan simulasi