Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Author
Sanusi, Vincent
Additional Author(s)
Valentino, Dennys
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011790/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix : p. 45 - 59
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00166/12
(T) 690.068 San S
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Djajanti Universal Gresik
Legalitas redesign dan shop drawing oleh kontraktor
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Optimalisasi kapasitas untuk memenuhi perencanaan produksi di PT X
Sukses anda terletak pada putaran waktu
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya