Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Author
Jayaputra, Iwan
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040819/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03725/04
(T) 658.54 Jay P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa efisiensi teknis dan ekonomis dari proses produksi dan alternatif peningkatan efisiensi di CV. Asterindo
Perancangan peningkatan produktivitas pada perusahaan aluminium X
Perencanaan kebutuhan bahan baku dan penjadwalan produksi
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi bisnis
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi pajak
Analisa kecukupan jumlah transporter dan rancangan jadwal shift kerja operator di PT Philips Indonesia
Pengoptimalan kapasitas produksi pail can di PT. Intipelangi Drumasindo