Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Author
Jayaputra, Iwan
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040819/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03725/04
(T) 658.54 Jay P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan peningkatan produktivitas pada perusahaan aluminium X
Identifikasi penyebab dan upaya pengurangan flowout reject quality control pada departemen IMM PT. X
LKP : penjadwalan kerja di PT Surya Tedjakusuma
Analisa regresi untuk penetapan waktu standard pembuatan tangki (study kasus di PT Meco)
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Perencanaan fasilitas dan sistem kerja dengan pendekatan ergonomi pada bagian pengebalan di departemen SKT Rungkut-2 PT "X"
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia