Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Productivity improvement by mtm analysis at PT Schneider Electric
Author
Sulistyaningsih, Ratna
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040930/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 140 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00627/06
(T) - 658.542 Sul P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan standar proses dan waktu proses pembuatan packing pada suplier PT X.
Analisa perbandingan produktivitas proses produksi antara mesin hidrolik ohtake dengan mesin hidrolik manual di PT Fuboru Indonesia
Motion and time study
LKP : PT Glogarindo Surabaya
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Penetapan waktu kerja standard proses pembuatan strain clamp di PT Bina Karya Baru
Upaya pengelolaan manajemen waktu kunjungan untuk menunjang pertumbuhan volume penjualan produk pakaian tidur di lima kantong pasar di Surabaya
Analisis produktivitas staf administrasi bagian bahan baku PT Bumi Rotan Jaya