Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Standarisasi aliran proses dan informasi pada departemen transport di PT. A
Perancangan sistem perencanaan produksi di Agrindo Engineering Unit (AEU) PT Agrindo
Perencanaan produksi agregat dengan formulasi fuzzy di PT. XYZ
Perbandingan sistem reorder point dengan distribution resource planning di PT.X.
Analisis perbandingan metode penjadwalan batch multi item dengan kombinasi algoritma tabu search dan ant colony (studi kasus pada CV Sinar Baja Electric)
Kanban for the shopfloor
Peran internal organisasi dan suasana inovasi untuk peningkatan kinerja UKM
Perancangan sistem perencanaan produksi dan pengendalian bahan baku departemen spinning di PT Lotus Indah Textil