Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan pengendalian persediaan bahan baku dengan memperhatikan kapasitas gudang di perusahaan sumber jaya
Perencanaan produksi dan pengendalian persediaan di PT. Indoasia
Perancangan sistem perencanaan dan pengendalian produksi di PT. Wim Cycle
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Perencanaan dan penjadualan produksi di PT.Duta Citra Audio Raya
Membandingkan algoritma tabu search ben-fawzan dengan solusi awal neh dan algoritma tabu search ben-fawzan dengan solusi awal CDS pada permasalahan Flow shop
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda