Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk.
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi bisnis
Penentuan waktu standar dan rumusannya serta penerapan metode activity based costing di PT X
Pengukuran kinerja di PT X dengan metode balanced scorecard
Perancangan sistem pengukuran kinerja dengan metode integrated performance measurement systems di PT. Cahaya Angkasa Abadi
LKP : perencanaan dan pengembangan produk tulip nail polish and remover
Penerapan non-financial performance measurement berdasarkan konsep balanced scorecard sebagai informasi bagi manajemen dalam rangka pengukuran kinerja pada.....
Analisa standar waktu potong dan layout gudang 10 PT. Spindo 1