Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Author
Wiryono, Nicho Francisco
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021434/IND/2010
Subject(s)
PRODUCTION PLANNING
TIME STUDY
JUST-IN-TIME SYSTEMS
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 61
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 61 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03845/10
(T) 658.562 Wir P
-
Unavailable : Removed
Similar Collection
by author or subject
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
Peningkatan kapasitas produksi pada divisi kalung lumakina kotak dengan metode line balancing dan methods time measurement di PT. Untung Bersama Sejahtera
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Production
Pengoptimalan alokasi tenaga kerja pada bagian refinery dan fractionation di PT. Smart Tbk.
Pengelolaan dan pengembangan usaha beton pada PT. Varia Usaha Beton Waru-Sidoarjo : rencana pengembangan fungsi produksi dan operasi
Perencanaan kebutuhan bahan baku dan penjadwalan produksi
Updating bill of material produk filter di PT X