Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Author
Lini, Mei Siu
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040997/IND/2005
Subject(s)
PRODUCTION PLANNING
SCHEDULING
QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 178 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00527/06
(T) - 658.53 Lin P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa produktivitas proses produksi untuk meningkatkan kapasitas produksi di departemen NCR CV Dirgahayu
Perbaikan sistem pengendalian kualitas pada divisi karet di PT. HRL International
Zero quality control
ISO 9001:2000 in brief
Penerapan sistem manajemen kualitas dalam upaya pendekatan ISO 9001 di PT Filma Utama Soap
Misselection analyzing and productivity improvement at biscuit selection department in PT Doulton
Perancangan sistem hazard analysis critical control point (haccp) di pt multi aneka pangan nusantara
Analisis pricing management bagian pricelist update departemen DIM Procurement di PT. X