Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Author
Lini, Mei Siu
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040997/IND/2005
Subject(s)
PRODUCTION PLANNING
SCHEDULING
QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 178 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00527/06
(T) - 658.53 Lin P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Productivity improvement in printing station MCB line using lean approach AT PT Schneider Indonesia
LKP: PT Inkor Bola Pacific Jln. Raya Surabaya-Malang, Ngadimulyo, Sukorejo, Pasuruan
Total quality development
Perancangan sistem management mutu ISO 9001:2000 di PT. X
Peningkatan efisiensi kerja dengan perancangan sistem PPIC di PT Tjandi Djaja Surabaya
Perencanaan kebutuhan bahan baku dan penjadwalan produksi
Total quality management
Upaya peningkatan layanan Lippo Telecom dengan menggunakan metode GAP