Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Author
Gandasutisna, Priscilla
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022003/IND/2016
Subject(s)
MOTION STUDY
TIME STUDY
PLAN LAYOUT
Notes
Appendix: p. 56-89
. Bibliography: p. 55.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02567/16
(T) IND 2003
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penetapan waktu kerja standard proses pembuatan strain clamp di PT Bina Karya Baru
Perbandingan product layout dan process layout dalam perbaikan tata letak PT. Almicos Pratama dengan metode simulasi
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda
Motion and time study
Analisis produktivitas staf administrasi bagian bahan baku PT Bumi Rotan Jaya
Penentuan lokasi depo dan jalur pengiriman bantuan bencana banjir di kabupaten Pasuruan, Jawa Timur
Efisiensi penggunaan peralatan pemindahan material menggunakan simulasi pada PT. Trias Sentosa
Analisa standarisasi kerja operator bush forming dan pin cutting menggunakan metode tabel standar kombinasi kerja di PT. XYZ