Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi di PT Wangta Agung I
Author
Dewi, Henny Meliza
Additional Author(s)
Engeline
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040864/IND/2004
Subject(s)
INDUSTRIAL MANAGEMENT
INVENTORY CONTROL
MOTION STUDY
PRODUCTION PLANNING
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 266 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03723/04
(T) 658.5 Dew P
-
Unavailable : Removed
Similar Collection
by author or subject
Kebijakan pengendalian persediaan bahan baku secara optimal dalam penggunaan ruang penyimpan pada PT Maskarebet Niscayajaya di Jombang
Pengalokasian operator pada lantai produksi PT X
Penerapan etika bisnis terhadap stakeholders pada CV Laris Jaya
Optimalisasi pembelian harian pagi untuk meningkatkan ekspektasi keuntungan Suyitno Agency melalui perencanaan kuantitas pemesanan
Perencanaan pengendalian persediaan bahan baku di pt. "x"
Penentuan waktu standar dan rumusannya serta penerapan metode activity based costing di PT X
Perancangan pengendalian persediaan dan tata letak gudang di PT. Aneka Prima
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)