Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Author
Widyastuti, Desi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000220/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-53
. Bibliography: p. 45-46.
Abstract
-
Physical Dimension
Number of Page(s)
x, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02611/16
(T2) MTS 0220
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Optimasi infrastruktur
Hubungan antara proses kepemimpinan pelaksana proyek dengan ukuran produktivitas mandor pada mall di Surabaya
Penggunaan penyelesaian sengketa pada proyek konstruksi
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Sistem manajemen konstruksi
Successful project management
Manajemen proyek konstruksi