Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Author
Widyastuti, Desi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000220/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-53
. Bibliography: p. 45-46.
Abstract
-
Physical Dimension
Number of Page(s)
x, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02611/16
(T2) MTS 0220
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Analisa faktor-faktor yang mempengaruhi perencanaan durasi aktifitas dalam proyek koonstruksi
Studi kasus terjadinya cacat konstruksi dengan pendekatan human error pada proyek gedung bertingkat
Integrating program management and systems engineering
Studi literatur tentang penerapan metode T.R.I.Z. di bidang teknik sipil
Project evaluation and procurement case studies