Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan proyek konstruksi : dari metode jalur kritis sampai pengenalan pemodelan informasi bangunan 4D
Author
Nugraha, Paul
Additional Author(s)
-
Publisher
Yogyakarta: Kanisius, 2021
Language
Indonesian
ISBN
9789792170184
Series
Subject(s)
CONSTRUCTION INDUSTRY--MANAGEMENT
PRODUCTION SCHEDULING
PROJECT MANAGEMENT
Notes
. Bibliography: p. 179-180. Index: p. 181-184
Abstract
-
Physical Dimension
Number of Page(s)
184 p.
Dimension
23 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00560/22
624.068 Nug P
Library - 7th Floor
Available
Similar Collection
by author or subject
Faktor-faktor yang mempengaruhi sub-kontraktor untuk mengikuti tender dan menentukan nilai mark-up
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Maintenance planning and scheduling
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Production planning and industrial scheduling
Construction scheduling with primavera project planner
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi