Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimasi multi-objektif permasalahan time-cost-quality trade-off pada proyek soho X dengan menggunakan metode metaheuristik
Author
Ho, Michael
Additional Author(s)
Gozal, Renaldy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012239/SIP/2018
Subject(s)
BUILDINGS--ESTIMATES
PROJECT MANAGEMENT
Notes
Appendix: p. 46-97
. Bibliography: p. 44-45.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02943/18
(T) SIP 2239
Library - 8th Floor
Available
Similar Collection
by author or subject
Project management for modern information systems
Current techniques in architectural practice
Model pemilihan kontraktor pemenang tender di sektor swasta menggunakan analytical hierarchi process (AHP)
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Project management
Manajemen proyek 23 Mei - 3 Juni 1977