Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Author
Limandinatha, Yesica
Additional Author(s)
Limantoro, Jeffry
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011802/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION MANAGEMENT
Notes
Bibliography : p. 179 - 180
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 180 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03928/11
(T) 658.924 Lim I
-
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Analisa pengaruh elemen lansekap terhadap nilai properti berdasarkan persepsi penghuni di kawasan perumahan Surabaya Timur dan Surabaya Barat
Sebab-sebab dan pengaruh klaim konstruksi di Surabaya
A survey of progress characteristics of construction projects in Thailand and Indonesia
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Analisa teori value chain terhadap kompetensi pada perusahaan kontraktor kelas a di Surabaya
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit
Analisa kesiapan penerapan concurrent engineering pada kontraktor di Surabaya