Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Author
Limandinatha, Yesica
Additional Author(s)
Limantoro, Jeffry
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011802/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION MANAGEMENT
Notes
Bibliography : p. 179 - 180
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 180 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03928/11
(T) 658.924 Lim I
-
Unavailable : Removed
Similar Collection
by author or subject
Principles of construction management
Analisis komparasi dan pengaruh beberapa variabel terhadap kepuasan hunian dan lokasi citra raya dan graha famili
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Survei kepuasan pengguna ruko terhadap jasa broker properti Surabaya
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Perbandingan sisa material antara dinding bata konvensional dengan dinding bata ringan pada proyek perumahan
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan