Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa frekuensi dan besaran nilai change order serta faktor penyebabnya pada pekerjaan konstruksi bangunan tinggi
Author
Simhanandi, Ferdian
Additional Author(s)
Budiharjo, Wirawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012006/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 38 - 43
. Bibliography: p. 37.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 43 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00552/15
(T) SIP 2006
-
Unavailable : Removed
Similar Collection
by author or subject
Keterkaitan kuantitas pekerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Tantangan yang berpengaruh dan keterampilan manajer proyek pada proyek bangunan hijau
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Radical project management
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Studi kasus mengenai struktrur organisasi pelaksana lapangan pada proyek konstruksi di Surabaya
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi