Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas pekerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
Notes
Appendix: p. 167 - 308
. Bibliography: p. 165 - 166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00544/15
(T) SIP 2005
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (unsafe condition) terhadap kecelakaan kerja konstruksi
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi
Model faktor penyebab risiko terhadap keberhasilan proyek konstruksi
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Penerapan resource allocation dan levelling tenaga kerja dengan menggunakan microsoft project 2010 pada suatu proyek konstruksi
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Pengaturan risiko hujan dalam kontrak serta dampak dan kendalanya pada proyek konstruksi