Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas pekerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
Notes
Appendix: p. 167 - 308
. Bibliography: p. 165 - 166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00544/15
(T) SIP 2005
-
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Evaluasi aspek-aspek kinerja owner pada proyek konstruksi
Studi harga satuan upah pada rumah mewah di daerah Surabaya
Penggunaan linear programming dan genetic algorithms dalam menyelesaikan time-cost trade-off problem
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Model faktor penyebab risiko terhadap keberhasilan proyek konstruksi
Survei mengenai biaya overhead serta faktor-faktor yang mempengaruhinya