Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas pekerja pada pekerjaan beton bertulang proyek bangunan bertingkat ( studi kasus proyek bangunan condominium TP-6 )
Author
Ardi, Fransisco
Additional Author(s)
Wanandy, Kefin C.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012035/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
REINFORCED CONCRETE
LABOR PRODUCTIVITY
CONSTRUCTION PROJECTS-MANAGEMENT
Notes
Appendix: p. 55-233
. Bibliography: p. 54.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 233 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02622/15
(T) SIP 2035
-
Unavailable : Removed
Similar Collection
by author or subject
Biaxial bending pada kolom beton bertulang
Reinforced concrete design
Model proyeksi dan optimalisasi cash flow multi proyek terintegrasi
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi
Analisa produktivitas pekerja dengan metode work sampling: Studi kasus pada proyek X
Survei mengenai biaya overhead serta faktor-faktor yang mempengaruhinya
Peningkatan produktivitas tenaga kerja area produksi assy air cleaner di PT. Astra Otoparts divisi adiwira plastik