Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model sumber dan penyebab rework pada tahapan proyek konstruksi
Author
Chundawan, Erick
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Tesis No. 01000186/MTS/2014
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 44 - 59
. Bibliography: p. 42 - 43 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00762/14
(T) 658.924 Chu M
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa faktor-faktor yang mempengaruhi strategi perusahaan yang berdampak pada penetapan harga produk realestate di Surabaya
Analisa faktor-faktor yang mendukung brand image terhadap pengembangan realestat di Surabaya
Kajian metode takt time pada proyek konstruksi
Evaluasi kinerja bangunan dengan ketidakberaturan sudut dalam yang direncanakan secara direct displacement based design
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
Industri konstruksi dan organisasi proyek
Analisa penyebab, proses administrasi pengaruh change order pada proyek infrastruktur dan bangunan gedung di Ambon
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi