Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi mengenai faktor-faktor penyebab rework pada proyek-proyek di Surabaya
Author
Hendarlim, Yanto
Additional Author(s)
Winata, Dyonisius Samuel
Publisher
Surabaya: 2004
Language
Chinese
ISBN
-
Series
Tugas Akhir No. 1318/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
x, 67 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01533/04
(T) 690.068 Hen S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis kemungkinan penggunaan kontrak i/d dalam upaya pencapaian target waktu kontruksi
Studi penerapan manajemen rantai pasok pengadaan material proyek konstruksi
Safety rules and procedures development and implementation
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Evaluasi apartemen High Point dari aspek finansial
Penerapan marketing mix oleh kontraktor pemula di Surabaya
Studi kasus penerapan metode pert pada proyek gudang
Manajemen konstruksi