Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Author
Kurniawan, Albert
Additional Author(s)
Sanjoyo, Ryan Nyoto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011794/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix : p. 86 - 161
. Bibliography : p. 84 - 85.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 161 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00642/13
(T) 690.0683 Kur P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Sebab-sebab dan pengaruh klaim konstruksi di Surabaya
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Pengaruh faktor jenis semen dan superplasticizer tipe polycarboxylate ether terhadap sifat-sifat mortar
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Construction extension to the PMBOK guide third edition