Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan metode pert pada proyek gudang
Author
William, Christian
Additional Author(s)
Clanchiu, Cefiro
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21010907/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-69
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02790/13
(T) 658.404 Wil S
-
Unavailable : Removed
Similar Collection
by author or subject
Tingkat kepentingan dan tingkat kepuasan dari faktor-faktor motivasi pekerja konstruksi
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Pembuatan dan aplikasi program simulasi kinerja backhoe-dump truck pada pemindahan tanah mekanis
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Managing projects
Manajemen konstruksi
Identifikasi dan peringkat kriteria-kriteria prakualifikasi konsultan perencana dan konsultan pengawas