Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan metode pert pada proyek gudang
Author
William, Christian
Additional Author(s)
Clanchiu, Cefiro
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21010907/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-69
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02790/13
(T) 658.404 Wil S
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Construction management
Analisa frekuensi dan penyebab change order pada proyek apartemen di Surabaya
Faktor-faktor risiko penyebab sengketa dan kejelasan pembagian tangung jawabnya
Design management
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Penerapan program dinamis probabilistik pada manajemen proyek konstruksi