Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara kepemimpinan manajer proyek dengan kepercayaan pada proyek konstruksi
Analisa peranan inovasi proses terhadap produktivitas perusahaan (studi kasus pada PT Wallet Mas, Semarang)
Analisa peranan inovasi proses terhadap produktivitas (studi kasus pada PT XYZ)
Studi komparatif kinerja tenaga kerja normal dan tenaga kerja penyandang cacat pada UD. Tiara Handicraft di Surabaya
Upaya peningkatan produktivitas pekerja bagian ring frame Departemen Spinning di PT. Lotus Indah textile industri
Analisa line balancing pada proses produksi cat tembok paragon di PT Tunggal Djaya Indah
Peranan disiplin kerja motivasi kerja dan produktivitas kerja karyawan PT Kiki Wijaya Plastik di Gedangan-Sidoarjo
Peningkatan upah dan premi terhadap produktivitas kerja karyawan bagian produksi pada PT "Ilufak" di Sidoarjo