Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa proyek direct loading conveyor di PT. Cakra Perkasa Jayamulia Banjarmasin
Pengaruh performance appraisal tenaga kerja dan upah dalam usaha meningkatkan produktivitas kerja karyawan bagian produksi divisi cor PT Untung Bersama Sejahtera Surabaya
Engineering project management
The structuring of build-operate-transfer construction projects
Pengaruh lingkungan kerja terhadap produktivitas kerja karyawan pada PT Coca Cola Tirtalina Bottling Company di Pandaan
Pengaruh motivasi dan pelatihan dalam meningkatkan produktivitas kerja karyawan perusahaan batik Mahkota Agung di Pekalongan
Studi kelayakan bisnis
Strategic human resource management