Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa change order dalam proyek konstruksi
Project management
The loyalty effect
Pengendalian pelaksanaan struktur gedung bertingkat untuk menghasilkan cara kerja yang efektip
Legalitas redesign dan shop drawing oleh kontraktor
Peranan partisipasi dan motivasi dalam upaya meningkatkan produktivitas kerja pada PT "PL" di Batu
Pengaruh frekuensi dan intensitas komunikasi upline ke downline terhadap produktivitas kerja downline di PT. Orindo Alam Ayu (oriflame) Surabaya
Integrated project management