Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kelayakan terhadap prospek pengembangan proyek PT X di Surabaya
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Metode seleksi dan pengukuran produktivitas tenaga kerja bidang produksi pada PT Inti Duta Lestari Plastik di Surabaya
Pentingnya motivasi dan disiplin kerja karyawan terhadap peningkatan produktivitas di PT Antar Surya Jaya Surabaya
Restrukturisasi organisasi untuk peningkatan produtivitas
Tingkat kepentingan dan alokasi resiko pada proyek konstruksi
Peran pemimpin dalam meningkatkan produktivitas karyawan PT. Adaya Multi Indoteknik
Studi kelayakan pada hotel berbintang tiga di Surabaya dilihat dari aspek pasar dan aspek keuangan