Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis pengaruh penilaian prestasi kerja dan kompensasi terhadap produktivitas kerja karyawan PT Heptasari Unggul Surabaya
Keselamatan kerja pada pelaksanaan penggalian tanah berdasarkan standar osha
Evaluasi kelayakan investasi proyek pada perusahaan pengalengan ikan tuna/cakalang PT. 'CRAC' di kota 'S' Irian Jaya
Sistem administrasi shop drawing
Analisa proyek direct loading conveyor di PT. Cakra Perkasa Jayamulia Banjarmasin
Analisa peranan inovasi proses terhadap produktivitas (studi kasus pada PT XYZ)
Pengaruh kompetensi dan kondisi kerja terhadap kinerja tenaga pemasar pada PT. Harmoni Dinamik Surabaya
Alternatif studi kelayakan aspek keuangan proyek bot - studi kasus darmo trade center