Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Sistem administrasi shop drawing
Author
Alexandria H, Alan
Additional Author(s)
Wibowo S, Adi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011644/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Bibliography: p. 37
Abstract
-
Physical Dimension
Number of Page(s)
xi, 37 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00771/09
(T) - 658.924 Ale S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Keselamatan kerja pada pelaksanaan penggalian tanah berdasarkan standar osha
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Manajemen proyek
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Tingkat kepentingan dan alokasi resiko pada proyek konstruksi
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Pengujian elemen cangkang yang terdapat dalam program komersial dengan analisis geometri linier dan nonlinier