Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa proyek direct loading conveyor di PT. Cakra Perkasa Jayamulia Banjarmasin
Author
Suryanata, Ricky
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0813/IND/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 72 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02866/04
(T) 658.404 Sur A
-
Unavailable : Removed
Similar Collection
by author or subject
Studi kelayakan salon mobil di Banjarmasin ditinjau dari aspek pasar, teknis, manajemen, dan keuangan
Systems analysis and project management
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Project management
Studi kasus pembuatan shop drawing pada proyek grande water place residences phase 1 Surabaya
Project management in the process industries
Studi tentang faktor-faktor yang menentukan perencanaan strategi dalam perusahaan konstruksi