Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran kinerja operator packer di divisi B III untuk menunjang perencanaan kerja yang lebih efektif di PT. xXx
Author
Soetomo, Marcus
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0737/IND/2003
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT-STATISTICAL METHODS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04216/03
(T) 658.5 Soe P
-
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi dan perbaikan bill of material di PT X.
Peningkatan kapasitas produksi di PT. Intipelangi Drumasindo
Penggunaan aspek-aspek teknis dan ekonomis sebagai dasar pengukuran tingkat efisiensi di PT Schering Plough Indoensia
Perancangan sistem pengukuran kinerja dengan metode integrated performance measurement systems di PT. Cahaya Angkasa Abadi
Penggunaan metode MRP dalam penentuan starting date dan released date pada produk training pack di perusahaan konveksi pakaian jadi Gin's collection
Perencanaan produksi dan pengendalian kualitas produk di pt. mulcindo steel industry
Reinventing the factory II
Perancangan jadwal preventive maintenance yang optimal pada divisi blow moulding di PT X