Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian produksi giverny 5' bench di CV Tri Star
Author
Kristanti, Ira
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041069/IND/2006
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 188 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04045/06
(T) - 658.5 Kri P
-
Unavailable : Removed
Similar Collection
by author or subject
Penjadualan produksi ubin keramik single firing di PT Asia Victory Industri Ltd.
Peningkatan output produksi di PT. XYZ
Prinsip-prinsip manajemen operasi
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Penjadwalan produksi pada CV. Naga Jaya Plastics di Surabaya
Operations management
Laporan tugas perencanaan dan perancangan produk "pen screwdriver"
Perencanaan penggunaan base paper pada unit coating dan finishing machine NCR dengan menggunakan program delphi 7.0 di CV Dirgahayu