Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa output produksi pipa GTE (Galvanized Threading End) pada proses threading di PT Spindo unit III
Author
Sutanto, Cindy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021601/IND/2012
Subject(s)
PRODUCTION MANAGEMENT
INPUT-OUTPUT ANALYSIS
Notes
Appendix : p. 54 - 124
Bibliography : p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04175/12
(T) 658.5 Sut A
-
Unavailable : Removed
Similar Collection
by author or subject
Customer-driven manufacturing
LKP : Perusahaan Plastik PT Makmur Jaya Kharisma
Assembly automation
Penentuan waktu output baku dan analisa perhitungan kapasitas output baku produksi unit 3 pt. panggung electric corporation (pec) surabaya
Input-output analysis of the public sector
Analisa peranan inovasi proses terhadap produktivitas (studi kasus pada PT XYZ)
Sistem pengendalian kualitas di pabrik kulit sintetis PT. "X"
LKP : PT. Bumi Wijaya Indah Kencana