Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Arika Kharisma Agung
Author
Wibianto
Additional Author(s)
Triyudi, Hans
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
MANUFACTURING PROCESSES
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 52 p.
Dimension
29 cm
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06423/98
L 670.42 Wib L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Peningkatan kualitas produk sandal menggunakan peta kendali p terstandarisasi di PT. Rajapaksi Adyaperkasa
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Improve metal shop process using lean six sigma at PT. Schneider Electric Indonesia
Studi eskeprimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program manajemen perhotelan
Perancangan perbaikan dengan lean manufacturing dalam proses produksi job shop pada PT. Alpha Jaya Manunggal Mandiri
Perencanaan kebutuhan material di PT. Weber Indahutama
Perancangan incoming material system departeman paku-seksi paku PT. Surabaya Wire