Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : penghitungan waktu baku dan efisiensi operator di PT Wonojati Wijoyo
Author
Setiawati, Anita
Additional Author(s)
Mregawati
Megawati
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi I
Subject(s)
MANUFACTURING PROCESSES
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 88 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06416/98
L 670.42 Set L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Perancangan keseimbangan lintasan di PT. Eben Haezer Surakarta
LKP : di CV Lambang Jaya ; mesin pengering kapulaga
Desain pengurangan lead time siklus kontrainer untuk mempercepat perputaran stok kontainer di PT X
LKP : PT ACE Metal Indonesia Surabaya
LKP : PT Mulcindo Surabaya
Machine tool technology and manufacturing processes
Manufacturing engineering and technology
LKP : proses produksi di PT Supra Aspindo Jaya